When climbing on and off a roof, there is a high possibility you’ll slip or fall. Providing safe egress and ingress for workers is critical, and we can help.
Access points are the most frequented hazard on any roof. Your workers are exposed to this risk twice every time they enter and exit to perform tasks. All ladders and hatches must be secured with a self-closing gate and safety-compliant railing. We’ll work closely with you to complete a fall protection assessment so you can ensure everyone is as safe as possible.
Section 5(a)(1) of the Occupational Safety and Health Act, requires that each employer furnish to each of its employees a workplace that is free from recognized hazards that are causing or likely to cause death or serious physical harm.OSHA General Duty Clause
Kee Hatch is designed for safe egress and ingress through the roof hatch while the hatch is open. Our self-closing safety gate ensures perimeter protection and secures the entire opening.
Kee Hatch
KeeGuard provides a permanent guardrail on either side of a fixed ladder with the added protection of a self-closing safety gate.
KeeGuard Ladder Access Kits
Kee Gate provides permanent hazard protection for external and internal access applications. Spring-loaded to automatically close behind the user, Kee Gate maintains a safe environment and reduces the possibility of human error.
Kee Gate Self-Closing Gates
See how our safety specialists created a comprehensive rooftop solution for our client.
Each employee is protected from falling into a ladderway floor hole or ladderway platform hole by a guardrail system and toeboards erected on all exposed sides, except at the entrance to the hole, where a self-closing gate or an offset must be used.
Safety Requirements for areas where danger exists of persons or objects falling through floor or wall openings, platforms, runways, ramps and fixed stairs, in normal, temporary, and emergency conditions. Applies to industrial and workplace situations.
As fall protection experts, we can perform a critical analysis on your rooftop to identify the hazards where your workers are exposed to the greatest risk. This ensures that the most dangerous areas are protected immediately with state-of-the-art systems and OSHA compliant solutions.
Your rooftop assessment.
Recognize the hazards.
Nationwide network of certified integrators.
Ensure compliance
Exceed regulatory requirements.
Protect and maintain safety.
A truly comprehensive rooftop solution follows the Hierarchy of Fall Protection. An expert starts by inspecting the roof site for potential fall hazards. From there, a complete system solution and recommendations are created that descend down the four levels of the hierarchy, from simple, sensible approaches for eliminating risks all the way down to lifesaving personal protection systems.
Collective Systems require no additional training to use. Work Restraint and Fall Arrest Systems both require a high level of user competency, training and additional inspection to be used properly.