Custom Powder Coated Safety Railing Installation for Commonwealth Charter Academy


Attachment1745347116615
The project was completed successfully and helped Fairchance Construction meet their time-sensitive obligations without issue.

Project Outcome

Close coordination with the concrete subcontractor enabled the railing installation to be completed smoothly in just 8–10 hours, helping the contractor meet a critical, time-sensitive portion of the contract without delay.

  • Fast Turnaround: Powder-coated material delivered within one month, ensuring project timelines stayed on track.
  • Seamless Coordination: Installation synchronized effectively with other trades, minimizing site disruption.
  • Adaptable Solutions: Kee Klamp fittings allowed for precise on-site adjustments to meet exact sizing needs.
  • Efficient Installation: Full railing system installed in just 8–10 hours, reducing labor costs and downtime.
  • On-Time Project Delivery: Helped the Contractor meet critical deadlines without delays.
  • Enhanced Site Safety: Provided a durable, compliant railing system that integrated with new heated sidewalks.
  • Reliable Performance: Smooth project execution without rework, supporting customer confidence and satisfaction.